All services

Give design-stage risk the structure and ownership it needs.

Jamie provides direct Principal Designer advisory for projects that need defined design-risk management, co-ordination and Health and Safety File control.

Discuss your CDM duties

Best for work that needs clear control.

  • Client and designer teams defining early-stage controls
  • Projects with multiple design disciplines
  • Schemes approaching handover and file close-out

Typical deliverables

  • Pre-construction information review
  • Design-risk register and co-ordination actions
  • Dutyholder meeting records
  • Health and Safety File plan and close-out structure

A service shaped around the requirement in front of you.

01

Create design-stage control before work reaches site

Construction risk is easier to manage when material decisions are visible early. Levantis provides direct advisory input for projects where the client and design team need a clear route through pre-construction information, design-risk coordination, dutyholder records and Health and Safety File planning. Jamie brings the health and safety perspective into the design conversation in a way that stays connected to programme, buildability, maintenance and handover.

The work is grounded in the Construction (Design and Management) Regulations 2015, statutory instrument 2015 No. 51. The regulations set duties across the project team. Regulation 4 addresses client arrangements for managing projects, regulation 5 covers appointment of principal designer and principal contractor where more than one contractor is involved, regulation 11 sets principal designer duties in the pre-construction phase, and regulation 12 addresses the construction phase plan and Health and Safety File.

02

Start with the information that drives decisions

Effective coordination starts with an honest picture of the project. Levantis reviews the information available to the design team, including the client brief, existing surveys, access constraints, programme, known hazards, site interfaces, design responsibilities and anticipated construction methods. The review draws out gaps, assumptions and priorities so the team has a shared basis for decisions before important design packages move forward.

Jamie sets up proportionate control for the instruction: a pre-construction information review, a design-risk register, action records, meeting prompts and an agreed Health and Safety File structure. The focus stays on significant risks that need active communication, design action, sequencing, residual-risk management or clear information for those who build, use, maintain or alter the asset. The format is shaped around the project’s scale, procurement route and governance arrangements.

03

Coordinate risk across designers and dutyholders

Design-risk coordination is not a separate paperwork exercise. Levantis helps the project team identify where risk passes between disciplines, packages, temporary works, access arrangements, services, maintenance, demolition, refurbishment or future use. Actions are recorded against named owners and reviewed at the point where a decision can still influence the design. This gives clients and designers a practical record of what was considered, what changed and what needs carrying forward.

Jamie can attend agreed design and coordination meetings, prepare focused agendas, capture decisions and maintain the action trail. The formal appointment and exact role scope are agreed before work begins. Levantis does not assume the legal responsibilities of a dutyholder without a written appointment and an instruction that defines authority, project boundaries, information flows and the interface with the client, principal contractor and wider design team.

04

Plan the Health and Safety File from the beginning

The Health and Safety File is most useful when it is planned while the project is being designed, not assembled as a last-minute archive. Levantis establishes a file index, information plan and collection route early. Designers and contractors then have clarity on the information that needs to be developed, checked and passed forward as the work progresses. This reduces the risk of handover becoming a scramble for drawings, warranties, operating information and residual-risk records.

At close-out, Jamie reviews the file against the agreed structure and records outstanding information with the responsible party. The process is informed by regulation 12 and by HSE L153, Managing health and safety in construction. It does not certify an asset as risk free or replace the responsibilities held by the client and appointed dutyholders. It provides a controlled route for the agreed project information to be assembled and handed over.

05

A defined appointment with practical judgement

Levantis is a founder-led consultancy. Jamie carries the technical work directly, keeping the person who understands the project close to the decisions, documents and meetings. The service suits clients and design teams that value a clear point of contact and want the discipline of CDM integrated into everyday project management rather than left to a distant reporting layer.

An initial conversation establishes the project type, current stage, dutyholder appointments, design disciplines, available information, planned works and expected deliverables. Levantis then proposes a clear scope, cadence and reporting route. The intent is straightforward: identify the work that needs a competent professional eye, make ownership clear and leave the project team with controlled records that remain useful from design through to handover.

A direct route from instruction to agreed output.

  1. 01

    Establish the project information

  2. 02

    Coordinate significant design risks

  3. 03

    Record actions and design decisions

  4. 04

    Prepare file information for handover

The relevant framework, applied to your instruction.

  • Construction (Design and Management) Regulations 2015 (SI 2015/51)
  • HSE L153: Managing health and safety in construction
  • CDM Regulations 2015, regulations 4, 5, 11 and 12
  • Project-specific client and designer duties

Talk through the scope directly with Jamie.

The starting point is a clear conversation about the requirement, timescale and expected output.

Discuss your CDM duties